Commissioning
4.2 Preparing for commissioning
Frequency inverters with Control Units CU230P-2 HVAC, CU230P-2 DP, CU230P-2 CAN
56
Operating Instructions, 01/2011, FW 4.4, A5E02430659B AD
4.2
Preparing for commissioning
Prerequisites: before you start
Before starting commissioning, you must answer the following questions:
●
What is the data for the connected motor?
●
What technological requirements must the drive fulfill?
●
Via which inverter interfaces does the higher-level control operate the drive?
Which motor are you using? [P0300]
A synchronous or
induction motor?
The inverters are preset
in the factory for
applications using 4-pole
three-phase induction
motors that correspond
to the performance data
of the inverter.
Motor data / data on the
motor rating plate
If you use the STARTER
commissioning tool and a
SIEMENS motor, you
only have to specify the
motor Order No. In all
other cases, you must
read-off the data from the
motor rating plate and
enter into the appropriate
parameters.
P0307
3~Mot
1LA7130-4AA10
EN 60034
Cos
ϕ
0.81
50 Hz
1455/min
5.5kW
19.7/11.A
230/400 V
Δ/Υ
Cos
ϕ
0.82
60 Hz
6.5kW
460 V
10.9 A
1755/min
No UD 0013509-0090-0031 TICI F 1325 IP 55 IM B3
Υ
440-480
11.1-11.3 A
45kg
Δ/Υ
220-240/380-420 V
19.7-20.6/11.4-11.9 A
P0311
P0308
P0304
P0305
P0310
95.75%
P0309