Rostock MAX v2 Assembly Guide – 4thEd.
When you're done with the four screws at the
bottom of the tower, move up to the top and tighten
those four, using the same order as you did the bottom.
Make sure the top of the tower is in contact with the stop
screw!
Repeat the square & tighten tasks for the Z
and Y towers.
Checkpoint Video #11
8 – Assembling, Installing, and Wiring the Top Section – 79
Fig. 8.9-2: Lower tightening order. (
Old style
wire shown.
)
Fig. 8.9-3: Upper tightening order.