Date Code 20010625
Inputs, Outputs, Timers, and Other Control Logic
iii
SEL-311L Instruction Manual
Latch Control Switch (With Time Delay Feedback) Operation Time Line ...................... 7-19
Figure 7.18:
SCADA Contact Pulses Input IN105 to Switch Active Setting Group Between
Control Equation Variable Timer SV8T Used in Setting Group Switching...... 7-23
Figure 7.21:
Rotating Selector Switch Connected to Inputs IN101, IN102, and IN103 for Active
Active Setting Group Switching (With Rotating Selector Switch) Time Line.................. 7-28
Control Equation Variables/Timers SV1/SV1T Through SV6/SV6T ............... 7-29
Control Equation Variables/Timers SV7/SV7T Through SV16/SV16T ........... 7-30
Figure 7.25:
Dedicated Breaker Failure Scheme Created With SEL
OGIC
Control Equation
Logic Flow for Example Output Contact Operation—OUT201–OUT206 ....................... 7-36
Summary of Contents for SEL-311L
Page 6: ......
Page 8: ......
Page 26: ......
Page 54: ......
Page 144: ......
Page 216: ......
Page 252: ......
Page 302: ......
Page 338: ......
Page 480: ......
Page 484: ......
Page 486: ......
Page 502: ......
Page 532: ...12 28 Standard Event Reports and SER Date Code 20010625 SEL 311L Instruction Manual 4 ...
Page 552: ......
Page 554: ......
Page 574: ......
Page 576: ......
Page 596: ......
Page 602: ......
Page 628: ......
Page 656: ......
Page 662: ......
Page 664: ......
Page 688: ......
Page 700: ......
Page 716: ......
Page 722: ......
Page 734: ......