J-6
Example Calculations for 87L Settings
Date Code 20010625
SEL-311L Instruction Manual
If the current transformer ratio for this 15 kV application is 60:1 (300/5), the phase charging
current is 1 A secondary, and the negative-sequence charging current (3I
2
) is 0.03 A secondary.
Again, make setting 87L2P = 0.5 A for excellent security and sensitivity.
Ground Fault Resistance Coverage With 87L2P = 0.5 A
In both examples, setting 87L2P = 0.5 A secondary allows ground fault resistance coverage up
to:
R
F
=
Ω
=
8
.
132
A
5
.
0
V
4
.
66
secondary
2
2
Assumes load current less than 1/3 of nominal secondary current. See Figure 3.8 for
ground fault resistance coverage with more load current.
Summary of Contents for SEL-311L
Page 6: ......
Page 8: ......
Page 26: ......
Page 54: ......
Page 144: ......
Page 216: ......
Page 252: ......
Page 302: ......
Page 338: ......
Page 480: ......
Page 484: ......
Page 486: ......
Page 502: ......
Page 532: ...12 28 Standard Event Reports and SER Date Code 20010625 SEL 311L Instruction Manual 4 ...
Page 552: ......
Page 554: ......
Page 574: ......
Page 576: ......
Page 596: ......
Page 602: ......
Page 628: ......
Page 656: ......
Page 662: ......
Page 664: ......
Page 688: ......
Page 700: ......
Page 716: ......
Page 722: ......
Page 734: ......