S&C Instruction Sheet 1043-550
61
Category
Event Description
Definition
Log Level
UIM
Ctrl operation retries failed
This message is only sent for IntelliTEAM initiated control
point requests. The timeout is configured at: External Device
Menu, Control Points, Control Point Operation Timeout (secs).
The default timeout is 10 seconds. After half of the timeout
(normally 5 seconds) one retry is initiated. If the status hasn’t
changed after the timer has elapsed (normally 10 seconds), this
message is output.
All
UIM
Ctrl point operation retry
This message is only sent for IntelliTEAM initiated control
point requests. The timeout is configured at: External Device
Menu, Control Points, Control Point Operation Timeout (secs).
The default timeout is 10 seconds. After half of the timeout
(normally 5 seconds) one retry is initiated.
All
UIM
Ctrl point operation successful
The UIM has verified the successful completion of the control
request initiated by IntelliTEAM II.
All
UIM
Data poll sent to host device
The DNP request for binary status, analog inputs, and binary
counters is being sent to the external/host device at the
External Device Menu - Module-to-Control Dev. Polling
Interval.
All
UIM
Data received from host device
The DNP data poll requested by the UIM to the external device
has been received.
All
UIM
Device data updates disabled
The Device Data Updates parameter on the BEGIN SETUP
screen has been set to Stopped, preventing data retrieved
from the external device from being used by SCADA and
IntelliTEAM II.
All
UIM
Device data updates enabled
The Device Data Updates parameter on the BEGIN SETUP
screen has been set to Running, allowing data retrieved from
the external device to be used by SCADA and IntelliTEAM II.
All
UIM
DNP appl. layer timeout
The application layer of DNP communications within the UIM
did not receive a confirmation for the latest request issued
within the message confirmation time limit. The timeout is
configured at: External Device Menu, module to control dev
polling timeout.
All
UIM
E.D. trouble active
When trouble status points are programmed at the UIM, when
they become active, this message is output.
All
UIM
E.D. trouble cleared
When trouble status points are programmed at the UIM, and
the trouble clears, this message is output.
All
Data Logging