![Notifier UniNet 2000 Installation, Operation, And Administration Manual Download Page 16](http://html1.mh-extra.com/html/notifier/uninet-2000/uninet-2000_installation-operation-and-administration-manual_1709911016.webp)
16
The Workstation Installation/Operation Manual Version 2 Document 51540 Rev. B1 4/8/02
Figure 1-1: Attaching the PCLB-5 to the Intel Pentium II Computer
1.1.2 Installation Description
This section describes the procedures for installing the computer system.
Site Requirements
The computer system can be installed in the following environmental conditions:
•
Temperature range of 0ºC - 49ºC (32ºF - 120ºF).
•
93% humidity non-condensing at 30ºC (86ºF).
Setup
The computer should be placed on a desk or table with the monitor, keyboard, and pointing device. This must be
done in accordance with local code requirements.
Connecting AC Power to the PC Power Supply of UniNet 2000 Computers
AC power must be connected in a permanent manner and enclosed by the included PCLB-5 (Intel Pentium II
computer) or PCLB-6 (Intel Pentium III computer) electrical box. An AC power line protector (HSP-121B) and UPS
are required for each power line on the workstation (CPU and monitor). Attach the AC power line to the CPU per
the following three figures:
PCLB-5
Knockout
Mounting Screws
Power Supply
Socket
Intel Pentium
II
NOTES:
The workstation requires 115 VAC, 60Hz primary power.
A UPS (Uninterruptable Power Supply) which is UL listed for use with fire protective signaling units is
required for each workstation.
The front power switch for the Intel Pentium II computer has been permanently disabled.
Power management options must be disabled in the CPU BIOS and on the monitor, or loss of network
communication or alarm reporting may result.
Summary of Contents for UniNet 2000
Page 14: ...14 The Workstation Installation Operation Manual Version 2 Document 51540 Rev B1 4 8 02 NOTES...
Page 36: ...36 The Workstation Installation Operation Manual Version 2 Document 51540 Rev B1 4 8 02 NOTES...
Page 62: ...62 The Workstation Installation Operation Manual Version 2 Document 51540 Rev B1 4 8 02 NOTES...
Page 86: ...86 The Workstation Installation Operation Manual Version 2 Document 51540 Rev B1 4 8 02 NOTES...
Page 102: ...102 The Workstation Installation Operation Manual Version 2 Document 51540 Rev B1 4 8 02 NOTES...
Page 118: ...118 The Workstation Installation Operation Manual Version 2 Document 51540 Rev B1 4 8 02 NOTES...
Page 122: ...122 The Workstation Installation Operation Manual Version 2 Document 51540 Rev B1 4 8 02 NOTES...
Page 128: ...128 The Workstation Installation Operation Manual Version 2 Document 51540 Rev B1 4 8 02 NOTES...
Page 130: ...130 The Workstation Installation Operation Manual Version 2 Document 51540 Rev B1 4 8 02 NOTES...
Page 136: ...136 The Workstation Installation Operation Manual Version 2 Document 51540 Rev B1 4 8 02 NOTES...
Page 150: ...150 The Workstation Installation Operation Manual Version 2 Document 51540 Rev B1 4 8 02 NOTES...
Page 168: ...168 The Workstation Installation Operation Manual Version 2 Document 51540 Rev B1 4 8 02 Notes...
Page 170: ...170 The Workstation Installation Operation Manual Version 2 Document 51540 Rev B1 4 8 02 NOTES...
Page 186: ...186 The Workstation Installation Operation Manual Version 2 Document 51540 Rev B1 4 8 02 NOTES...
Page 197: ...197 The Workstation Installation Operation Manual Version 2 Document 51540 Rev B1 4 8 02 NOTES...
Page 198: ...198 The Workstation Installation Operation Manual Version 2 Document 51540 Rev B1 4 8 02 NOTES...
Page 199: ...199 The Workstation Installation Operation Manual Version 2 Document 51540 Rev B1 4 8 02 NOTES...