120Eg User Guide - Appendix B
5 - 50
■
Alternate lighting green or amber
Indicates that the hard disk is being rebuilt (this status is not a failure). If the
defected hard disk is replaced with a new one in the disk array configuration, the
data is automatically rebuilt (auto rebuild function). During the rebuild operation,
the lamp is lit green or amber alternatively.
The lamp goes off when the rebuild is terminated normally. The lamp goes on
amber if the rebuild fails.
Caution
To abort rebuilding, power off the server. In such a case, restart
the server, hot-swap the failed hard disk, and restart rebuilding.
Observe the following notes to use the auto-rebuild feature.
■
Do not power off the server. (If the server is powered off
before rebuilding hard disks, the auto-rebuild feature will not
start.)
■
When you removed a hard disk, wait at least 90 seconds
before installing the hard disk back again.
■
Do not replace another hard disk while rebuilding is in
progress.
Power Supply Lamps (hot-swap power supply model only)
The power supply on the rear of the server has two lamps.
Note:
The server equipped with an optional power unit can
continue the operation with the normal power unit if the other
power unit is defected (redundant function). The defected
power unit can be replaced with a new one in the hot-swap
mode without power interruption.
Power supply condition
Power Supply LEDs
LED #1 (Power) Green
LED #2 (FAIL) Amber
No AC power to all PSU
OFF
OFF
No AC power to this PSU only or power supply
failure or current limit
OFF
ON
AC present / only standby output ON
Blink green
OFF
Power supply DC outputs ON and OK
Green
OFF
Summary of Contents for Express 5800 120Eg
Page 1: ... User s Guide Express 5800 120Eg ...
Page 2: ......
Page 4: ......
Page 16: ...120Eg User Guide Table of Contents xiv ...
Page 291: ......
Page 292: ... ...