9.2.3 Message management.
The system manages displayed messages using codes:
Operation codes.
Code 1 - 57
Messages relating to system status, warnings or errors, displayed in the status bar,
or full screen dialog messages requiring user input by clicking ‘OK’ to confirm the
message or ‘Cancel’ to abort.
Code 200 - 205
Messages requiring user choice.
Test result error codes:
Code 100 - 106
Test-related notifications in result dialogs.
Example
Following dialog with a pop-up window:
For more information regarding these codes,
Consult chapter 15.4 Message codes. on page 160
9.3 Booting up the BALTO System.
Carry out the assembly and all connections as described in the previous chapter.
The High-speed DC Circuit Breaker must be in the OFF position.
9.3.1 Start procedure.
Connect the system to the mains supply.
The indicator light of the O/I button should illuminate.
Pressing the O/I button begins the automated start-up procedure.
Several dialogs will be presented on the screen while the system starts up.
www.megger.com
39
Operation