Fig 38:
Test object: Measurement connection.
NOTE :
Please disconnect the voltage drop test leads after the voltage drop measurement has been
completed.
Making a measurement
Select ‘mV’ in the ‘Selection Testmode’ menu.
The following dialog is displayed:
www.megger.com
78
Operation