Fig 33:
BALTO Modular System with only two slots.
The DC Current Generators have assigned positions on the Support Carriage. When assembling the system, please
follow the ordering as indicated.
The mechanical positions of the Power Junction Connectors are aligned specifically for the indicated ordering.
The system calibration is performed specifically using the indicated ordering.
The DC Current Generators are labelled ‘PU1’ (Power Unit 1 - bottom) to ‘PU5’ (Power Unit 5 - top).
PU5
PU4
PU3
PU2
PU1
Fig 34:
BALTO Modular System with PU indication.