Procedure 6.26: VERIFY SOFTWARE BACKUP DISK
OVERVIEW
WARNING:
This procedure could abort if the
5ESS
®
-2000 switch contains a software update in the temporary
state. This would be due to differences between the incore version and the disk version created by a
temporary software update. Please check [master control center (MCC) Page 1960] before continuing
with this procedure.
This procedure allows the craft to use the automated VFYTXT process to verify that a recently made software
backup disk will boot the office.
The words ``recently made'' used previously mean that the copy of text on the software backup disk is at the same
software update level as the
5ESS
®
-2000 switch. If this is not true, this verification procedure will not work and must
not be used.
The software backup disk verification procedure accomplishes the following tasks:
Makes the disk off-line
Runs the compare disk to core commands
Runs the verify file commands
Makes the disk OOS
Restores the disk.
NOTE 1:
If VFYTXT is run from the MCC or STLWS, the craft may escape to enter commands or pokes
by operating the
CMD
key. However, the VFYTXT process will continue to run and update the screen. Any
commands or pokes that update the screen will overlap with the VFYTXT updates of the screen.
To return to VFYTXT:
Enter Poke
120
for the messages page.
Operate the
CMD
key (causing an
NG
response).
Request a craft input to refresh the VFYTXT screen.
Continue with VFYTXT normally.
NOTE 2:
If VFYTXT gets hung, the craft can force an abort by entering VFYTXT from another terminal and
following the instructions on the screen to force the first terminal process to abort.
PROCEDURE
1.
To start up VFYTXT, enter Poke
193
on STLWS terminal (or MCC only if necessary), or
type and enter on RC/V terminal:
RCV:MENU:VFYTXT;
Response on terminal:
235-105-210
October 1999
Copyright © 1999
Page 1
Summary of Contents for 5ESS-2000
Page 96: ...235 105 210 October 1999 Copyright 1999 Page 2 ...
Page 184: ...235 105 210 October 1999 Copyright 1999 Page 3 ...
Page 300: ...13 STOP YOU HAVE COMPLETED THIS PROCEDURE 235 105 210 October 1999 Copyright 1999 Page 55 ...
Page 339: ...7 STOP YOU HAVE COMPLETED THIS PROCEDURE 235 105 210 October 1999 Copyright 1999 Page 13 ...
Page 342: ...235 105 210 October 1999 Copyright 1999 Page 2 ...
Page 359: ...235 105 210 October 1999 Copyright 1999 Page 5 ...
Page 609: ...2 STOP YOU HAVE COMPLETED THIS PROCEDURE 235 105 210 October 1999 Copyright 1999 Page 12 ...
Page 676: ...235 105 210 October 1999 Copyright 1999 Page 9 ...
Page 792: ...3 STOP YOU HAVE COMPLETED THIS PROCEDURE 235 105 210 October 1999 Copyright 1999 Page 9 ...
Page 799: ...Figure 11 36 3 1 Cleaning Points 235 105 210 October 1999 Copyright 1999 Page 7 ...
Page 801: ...235 105 210 October 1999 Copyright 1999 Page 9 ...
Page 839: ...2 STOP YOU HAVE COMPLETED THIS PROCEDURE 235 105 210 October 1999 Copyright 1999 Page 16 ...
Page 999: ...2 STOP YOU HAVE COMPLETED THIS PROCEDURE 235 105 210 October 1999 Copyright 1999 Page 13 ...
Page 1008: ...Figure 11 55 1 CTSNS DIP Switch Settings 235 105 210 October 1999 Copyright 1999 Page 2 ...
Page 1011: ...235 105 210 October 1999 Copyright 1999 Page 5 ...
Page 1053: ...235 105 210 October 1999 Copyright 1999 Page 15 ...
Page 1289: ...Figure 15 17 2 AMATPS Data Link 235 105 210 October 1999 Copyright 1999 Page 2 ...
Page 1292: ...235 105 210 October 1999 Copyright 1999 Page 5 ...
Page 1303: ...9 STOP YOU HAVE COMPLETED THIS PROCEDURE 235 105 210 October 1999 Copyright 1999 Page 2 ...
Page 1360: ...Figure 15 47 2 Typical SCANS III Link Diagram 235 105 210 October 1999 Copyright 1999 Page 2 ...
Page 1372: ...235 105 210 October 1999 Copyright 1999 Page 2 ...
Page 1374: ...235 105 210 October 1999 Copyright 1999 Page 4 ...
Page 1421: ...Table 1 1 O M Checklist 235 105 210 October 1999 Copyright 1999 Page 3 ...