Standard operating procedure (all models)
8
68
AXIS-GENERAL
Figure 8.24:
Layout of the catch trays
Set the trays horizontally. Slanted trays may cause measurement errors
(
).
Carry out a calibration test (see chapter B.6 for each solid fertiliser broadcast-
er model).
Right and left hand side metering slides should be adjusted and set (see
chapter B.4 for each solid fertiliser broadcaster model).
Run spreading test with the openings set as calculated for the job.
Travelling speed: choose
3 - 4 km/h
.
Open metering slide
10 m before
the catch trays.
Close metering slides approx.
30 m after
the catch trays.
NOTICE
If the quantity in the trays is too low, repeat the run.
Do not change the adjustment of the metering slide.
Summary of Contents for AXIS 20.1
Page 4: ......
Page 12: ...Contents VIII...
Page 14: ...Intended use 1 2 AXIS GENERAL...
Page 46: ...Transport without tractor 6 34 AXIS GENERAL...
Page 48: ...Instructions regarding the spreading process 7 36 AXIS GENERAL...
Page 156: ...Maintenance and repair C 144 AXIS GENERAL AXIS 20 1 AXIS 30 1 W AXIS 40 1 W...
Page 194: ...Appendix D 182 AXIS GENERAL AXIS 20 1 AXIS 30 1 W AXIS 40 1 W AXIS 50 1 W...
Page 214: ......
Page 215: ......