Spreading operation
155
B
AXIS
20.1
AXIS
20.1
AXIS
30.1 (W), AXIS 40.1 (W)
AXIS 50.1 W
B.6.1
Running calibration test
Requirements:
The metering slides are closed.
PTO shaft and tractor engine are switched off and locked to prevent acciden-
tal starting.
Have a sufficiently large hopper ready for holding the fertiliser (holding capac-
ity at least
25 kg
). Determine the unladen weight of the collection vessel.
Have the calibration test chute ready. The calibration test chute is in the cen-
tre behind the spreading disc guard.
A sufficient quantity of fertiliser is placed in the hopper.
The speed of the PTO shaft is known with the help of the calibration chart.
Desired output volume, working width and mean speed are entered into the
electronic control system.
n
WARNING
Risk of injury due to chemicals
Discharged fertiliser may cause injuries to eyes and nasal mucous
membranes.
Wear safety goggles during the calibration test.
Direct all persons out of the danger zone of the solid ferti-
liser broadcaster before the calibration test.
NOTICE
Select the values for the calibration test for the maximum possible application
rate. The greater the application rate the greater the precision of the measure-
ment.
[1] Position of calibration test chute
Figure 7:
Calibration test chute
1
Summary of Contents for AXIS 20.1
Page 4: ......
Page 12: ...Contents VIII...
Page 14: ...Intended use 1 2 AXIS GENERAL...
Page 46: ...Transport without tractor 6 34 AXIS GENERAL...
Page 48: ...Instructions regarding the spreading process 7 36 AXIS GENERAL...
Page 156: ...Maintenance and repair C 144 AXIS GENERAL AXIS 20 1 AXIS 30 1 W AXIS 40 1 W...
Page 194: ...Appendix D 182 AXIS GENERAL AXIS 20 1 AXIS 30 1 W AXIS 40 1 W AXIS 50 1 W...
Page 214: ......
Page 215: ......