Spreading Operation
93
B
AXIS
20.1
AXIS
20.1
B.6.2
Running calibration test
Requirements:
The metering slides are closed.
PTO shaft and tractor engine are switched off and locked to prevent acciden-
tal starting.
Have a sufficiently large hopper ready for holding the fertiliser (holding capac-
ity at least
25 kg
). Determine the unladen weight of the bin.
Have the calibration test chute ready. The calibration test chute is in the cen-
tre behind the spreading disc guard.
A sufficient quantity of fertiliser is placed in the hopper.
The preliminary settings for the metering slide stop, the PTO speed and the
calibration test time are specified and known from the calibration charts.
n
WARNING
Risk of injury due to chemicals
Discharged fertiliser may cause injuries to eyes and nasal mucous
membrane.
Wear safety goggles during the calibration test.
Direct all persons out of the danger zone of the solid ferti-
liser broadcaster
NOTICE
Select the values for the calibration test for the maximum possible spreading
rate. The greater the application rate the greater the precision of the measure-
ment.
[1] Position of calibration test chute
Figure 19:
Calibration test chute
1
Summary of Contents for AXIS 20.1
Page 4: ......
Page 12: ...Contents VIII...
Page 14: ...Intended use 1 2 AXIS GENERAL...
Page 46: ...Transport without tractor 6 34 AXIS GENERAL...
Page 48: ...Instructions regarding the spreading process 7 36 AXIS GENERAL...
Page 156: ...Maintenance and repair C 144 AXIS GENERAL AXIS 20 1 AXIS 30 1 W AXIS 40 1 W...
Page 194: ...Appendix D 182 AXIS GENERAL AXIS 20 1 AXIS 30 1 W AXIS 40 1 W AXIS 50 1 W...
Page 214: ......
Page 215: ......