SAN32M-2 Installation and Service Manual
150
DANGER
Overloading a branch circuit is potentially a fire hazard and a shock
hazard under certain conditions. To avoid these hazards, ensure that
your system electrical requirements do not exceed branch circuit
protection requirements. Refer to the information that is provided
with your device or the power rating label for electrical
specifications.
(D002)
2. Plug power cords into facility power sources and AC connectors
at the rear of the switch. When the first power cord is connected,
the switch powers on and performs power-on self-tests (POSTs).
NOTE:
For high availability, plug the power cords into
separate facility power circuits.
3. During POSTs:
— The green
PWR
LED on the switch front panel illuminates.
— The amber
ERR
LED on the switch front panel blinks
momentarily while the switch is tested.
— The green LED associated with the Ethernet port blinks
momentarily while the port is tested.
— The blue/green and amber LEDs associated with Fibre
Channel ports blink momentarily while the ports are tested.
4. After successful POST completion, the
PWR
LED remains
illuminated and all amber LEDs extinguish.
5. If a POST error occurs, go to
MAP 0000: Start MAP
to isolate the
problem.
Summary of Contents for SAN32M-2
Page 2: ......
Page 10: ...SAN32M 2 Installation and Service Manual xii...
Page 14: ...SAN32M 2 Installation and Service Manual xvi...
Page 42: ...SAN32M 2 Installation and Service Manual 16...
Page 120: ...SAN32M 2 Installation and Service Manual 94...
Page 174: ...SAN32M 2 Installation and Service Manual 148...
Page 236: ...SAN32M 2 Installation and Service Manual 210...
Page 240: ...SAN32M 2 Installation and Service Manual 214...
Page 244: ...SAN32M 2 Installation and Service Manual 218...
Page 290: ...SAN32M 2 Installation and Service Manual 264...
Page 308: ...SAN32M 2 Installation and Service Manual 282...
Page 311: ......
Page 312: ...Printed in USA GC26 7763 01...