
8.4.18 Installing the Battery
Procedure
Step 1 Power off the server node.
.
Step 2 Remove the server node.
Step 3 Place the server node on the ESD workstation.
Step 4 Take the component out of its ESD bag.
Step 5 Determine the position of the battery.
Figure 8-52 Position of the battery
Step 6 Remove the PCIe riser module.
8.4.22 Installing a PCIe Riser Module
.
Step 7 Holding the battery with the text side facing upwards, insert the left end of the
battery into the slot, and gently press down the whole battery into the slot.
Figure 8-53 Installing the battery
FusionServer Pro XH321 V5 Server Node
Maintenance and Service Guide
8 Parts Replacement
Issue 17 (2021-03-09)
Copyright © Huawei Technologies Co., Ltd.
86