
Step 2 Remove the server node.
Step 3 Place the server node on the ESD workstation.
Step 4 Remove the air duct.
.
Step 5 Take the component out of its ESD bag.
Step 6 Determine the position of the processor.
Figure 8-34 Positions of processors
Step 7 Install the processor on the carrier.
1. Take a processor carrier out of an ESD bag.
2. Aligning the notch in one edge of the processor with the protrusion on the
processor carrier, secure it.
Ensure that the processor corner with a triangle mark is in the corner of the
processor carrier with a notched triangle.
FusionServer Pro XH321 V5 Server Node
Maintenance and Service Guide
8 Parts Replacement
Issue 17 (2021-03-09)
Copyright © Huawei Technologies Co., Ltd.
70