
Figure 8-35 Installing one end of the processor
3. Bend the other edge of the processor carrier in the arrow direction.
Figure 8-36 Installing the other end of the processor
4. Release the processor carrier so that the other edge of the processor clips into
place.
5. Check that the processor and the carrier are level and the processor is firmly
secured. If the processor is tilted, gently press the tilted part to fasten it.
Step 8 Apply thermal compound.
1. Determine the area on the processor that will be in contact with the heat
sink, and evenly apply 0.4 ml of thermal compound on the area.
NO TE
– When applying thermal compound, place the processor carrier on the desktop.
– The thermal compound injector has volume marks.
The two-line, five-dot, s-shape, and X-shape patterns are recommended.
FusionServer Pro XH321 V5 Server Node
Maintenance and Service Guide
8 Parts Replacement
Issue 17 (2021-03-09)
Copyright © Huawei Technologies Co., Ltd.
71