
Step 6 Install memory modules.
8.4.14 Installing a Memory Module
.
Step 7 Install M.2 SSDs.
Step 8 Install the TPM.
Step 9 Install the PCIe card.
Step 10 Install the PCIe riser module.
8.4.22 Installing a PCIe Riser Module
.
Step 11 Install the screw-in RAID controller card.
8.4.4 Installing the Screw-in RAID Controller Card
Step 12 Install the supercapacitor if it is configured.
8.4.6 Installing the Supercapacitor
Step 13 Install the air duct.
8.4.24 Installing the Air Duct
.
Step 14 Install the server node.
Step 15 Power on the server node.
.
Step 16 Check the indicator status. If the health status indicator is steady green, the server
node is running properly.
For details, see
Step 17 To burn the product SN in the new mainboard, contact technical support.
NO TICE
If the product SN is not burnt in the new mainboard, the iBMC and OS cannot
obtain the product SN. This may affect the running of some services or the
monitoring and management on the device.
Step 18 After the mainboard is replaced, the LOM is replaced and the MAC address of the
LOM is changed. If the LOM is used for transferring data, you need to configure
the LOM data.
Step 19 After the mainboard is replaced, the iBMC and BIOS settings are restored to the
default settings of the new mainboard. Configure the iBMC and BIOS based on
service requirements.
FusionServer Pro XH321 V5 Server Node
Maintenance and Service Guide
8 Parts Replacement
Issue 17 (2021-03-09)
Copyright © Huawei Technologies Co., Ltd.
101