
Step 9 Connect the cable to the RAID controller card.
.
Step 10 Install the server node.
Step 11 Power on the server node.
.
Step 12 Configure the RAID controller card.
Huawei V5 Server RAID Controller Card User Guide
----End
8.4.5 Removing the Supercapacitor (Server with a Screw-in
RAID Controller Card)
Procedure
Step 1 Power off the server node.
.
Step 2 Remove the server node.
Step 3 Place the server node on the ESD workstation.
Step 4 Determine the position of the supercapacitor.
Step 5 Remove the air duct for the supercapacitor.
Step 6 Remove the supercapacitor holder.
1. Loosen the screws on the server node panel. See (1) in
.
2. Remove the panel. See (2) in
.
3. Loosen the screws that secure the supercapacitor holder and remove the
supercapacitor holder. See (3) in
FusionServer Pro XH321 V5 Server Node
Maintenance and Service Guide
8 Parts Replacement
Issue 17 (2021-03-09)
Copyright © Huawei Technologies Co., Ltd.
58