
Step 2 Remove the server node.
Step 3 Place the server node on the ESD workstation.
Step 4 Determine the position of the PCIe riser module.
Step 5 Remove the filler panel.
NO TE
● Perform this operation only when a filler panel is installed.
● Keep the removed filler panel properly.
FusionServer Pro XH321 V5 Server Node
Maintenance and Service Guide
8 Parts Replacement
Issue 17 (2021-03-09)
Copyright © Huawei Technologies Co., Ltd.
93