
The TPM settings take effect after the server is restarted.
----End
8.4.17 Removing the Battery
Procedure
Step 1 Confirm the BIOS configuration.
CA UTION
After the battery is replaced, the original BIOS configuration will be lost. If the
current BIOS parameters have been adjusted based on service scenarios, ensure
that the parameter configuration is the same as that before the battery is replaced
to ensure that services are not affected after the battery is replaced.
Step 2 Export the BIOS configuration file.
FusionServer Pro X6000 Server iBMC User Guide
NO TE
● The iBMC supports import and export of configuration files from version 2.32.
● The BIOS configuration file exported from the iBMC can be directly imported after the
battery is replaced. If the exported configuration file contains ciphertext, change the
ciphertext to plaintext and delete the comment tags from the line. For details about
how to import and export configurations, see
FusionServer Pro X6000 Server iBMC
.
● The BIOS configuration file exported from the iBMC contains the configuration list. For
details, see "Configuration File Description" in
FusionServer Pro X6000 Server iBMC
.
● If the iBMC cannot be logged in to or the BIOS configuration file is not exported before
the battery is replaced, you need to manually reconfigure the BIOS after replacing the
battery.
Step 3 Power off the server node.
.
Step 4 Remove the server node.
Step 5 Place the server node on the ESD workstation.
Step 6 Determine the position of the battery.
FusionServer Pro XH321 V5 Server Node
Maintenance and Service Guide
8 Parts Replacement
Issue 17 (2021-03-09)
Copyright © Huawei Technologies Co., Ltd.
84