6-11
dummyhead
dummyhead
FUEL SYSTEM
Remove the carburetor heater [1] and ground terminal
[2].
Installation is in the reverse order of removal.
INSPECTION
Measure the resistance at the carburetor heater [1]
terminals.
If the resistance is out of specification, replace the
carburetor heater.
THERMO SWITCH INSPECTION
Remove the right side cover (page 2-2).
Remove the thermo switch from the connector boot [1].
Disconnect the thermo switch 2P connector [1].
Check for continuity between the terminals.
If thermo switch is out of specification, replace the
switch.
TORQUE: CARBURETOR HEATER:
4.9 N·m (0.5 kgf·m, 3.6 lbf·ft)
[1]
[2]
STANDARD: 8.2 – 12.3
Ω
(25°C/77°F)
[1]
[1]
STANDARD:
Above 20°C/68°F: No continuity
Below 7°C/45°F:
Continuity
[1]
Summary of Contents for XL125LK
Page 5: ...MEMO dummyhead dummyhead ...
Page 59: ...MEMO dummyhead dummyhead ...
Page 89: ...MEMO dummyhead dummyhead ...
Page 113: ...9 2 dummyhead dummyhead CYLINDER PISTON CYLINDER PISTON SYSTEM COMPONENTS ...
Page 131: ...MEMO dummyhead dummyhead ...
Page 187: ...MEMO dummyhead dummyhead ...
Page 213: ...MEMO dummyhead dummyhead ...
Page 221: ...MEMO dummyhead dummyhead ...
Page 233: ...MEMO dummyhead dummyhead ...
Page 241: ...MEMO dummyhead dummyhead ...