17-7
dummyhead
dummyhead
BATTERY/CHARGING SYSTEM
REGULATOR/RECTIFIER
SYSTEM INSPECTION
Remove the fuel tank (page 2-4).
Check the regulator/rectifier 4P connector [1] for loose
contact or corroded terminals.
If the charging voltage reading (page 17-6) is out of the
specification, check the following at the wire harness
side connector.
If all components of the charging system is normal and
there are no loose connections at the regulator/rectifier
4P connector, replace the regulator/rectifier unit.
REMOVAL/INSTALLATION
Remove the fuel tank (page 2-4).
Disconnect the regulator/rectifier 4P connector [1].
Remove the bolts [2] and regulator/rectifier [3] from the
frame.
Install the regulator/rectifier in the reverse order of
removal.
ALTERNATOR CHARGING COIL
INSPECTION
Remove the left side cover (page 2-2).
Disconnect the alternator 2P connector [1].
Measure the resistance between each wire terminal of
the alternator.
Replace the alternator stator if resistance is out of
specification.
Refer to procedure for alternator stator replacement
(page 11-4).
Item
Terminal
Specification
Battery charging
line
Red/white (+) and
Ground (–)
Battery voltage
should appear
Charging coil line White and
Green
0.2 – 1.2
Ω
(at 20°C/68°F)
Ground line
Green and
Ground
Continuity
should exist
[1]
[1]
[3]
[2]
Charging coil line
CONNECTION: White – Green
STANDARD:
0.2 – 1.2
Ω
(20°C/68°F)
[1]
G
W
[1]
Summary of Contents for XL125LK
Page 5: ...MEMO dummyhead dummyhead ...
Page 59: ...MEMO dummyhead dummyhead ...
Page 89: ...MEMO dummyhead dummyhead ...
Page 113: ...9 2 dummyhead dummyhead CYLINDER PISTON CYLINDER PISTON SYSTEM COMPONENTS ...
Page 131: ...MEMO dummyhead dummyhead ...
Page 187: ...MEMO dummyhead dummyhead ...
Page 213: ...MEMO dummyhead dummyhead ...
Page 221: ...MEMO dummyhead dummyhead ...
Page 233: ...MEMO dummyhead dummyhead ...
Page 241: ...MEMO dummyhead dummyhead ...