![GW Instek GSM-20H10 User Manual Download Page 32](http://html1.mh-extra.com/html/gw-instek/gsm-20h10/gsm-20h10_user-manual_2280064032.webp)
GETTING STARTED
30
G
ETTING STARTED
This chapter describes the starting up procedures and
the preparation that is necessary before operating the
instrument.
Safety Remind
During the power-up, voltage spikes may appear on the
terminals of the GSM-20H10. These voltage spikes could be
at hazardous levels (42.4V peak) and could damage
sensitive DUTs. Never touch external circuitry or the test
leads when powering up the GSM-20H10.
To prevent electric shock, test connections must be
configured such that the user cannot come in contact with
conductors or any DUT that is in contact with the
conductors. Safe installation requires proper shields,
barriers, and grounding to prevent contact with conductors.
Hazardous voltages may be present on the output and
guard terminals. To prevent electrical shock that could
cause injury or death. NEVER make or break connections to
the GSM-20H10 while GSM-20H10 is on. Power off the
equipment from the front panel or disconnect the main
power cord from the rear of the GSM before handling cables
connected to the outputs. Putting the equipment into
standby mode does not guarantee the outputs are not
powered if a hardware or software fault occurs.