8-6
G650 Generator Protection & Control System
GEK-113285A
8.2 BOOT CODE UPGRADE
8 BOOTCODE AND FIRMWARE UPGRADE
8
After accepting to proceed, a window will open up for selecting a temporary IP Address. It is advisable to set the IP Address
that is going to be used lately in the relay for Ethernet connection.
Figure 8–7: TEMPORARY IP ADDRESS SELECTION FOR BOOT UPGRADE
After entering the temporary IP address, a window will open up for selecting the appropriate file from the Multilin web site or
Product CD.
Figure 8–8: BOOT FILE SELECTION
Once the appropriate boot program file has been selected, the program will proceed to load the selected file.
Figure 8–9: LOADING BOOT FILE
Summary of Contents for Multilin G650
Page 9: ...8 G650 Generator Protection Control System GEK 113285A TABLE OF CONTENTS ...
Page 426: ...GEK 113285A G650 Generator Protection Control System A 31 APPENDIX A A 1 LOGIC OPERANDS A ...
Page 427: ...A 32 G650 Generator Protection Control System GEK 113285A A 1 LOGIC OPERANDS APPENDIXA A ...
Page 587: ...C 22 G650 Generator Protection Control System GEK 113285A C 8 ANALOG INPUTS APPENDIXC C ...
Page 639: ...G 2 G650 Generator Protection Control System GEK 113285A G 1 GE MULTILIN WARRANTY APPENDIXG G ...