5-14
G650 Generator Protection & Control System
GEK-113285A
5.2 PRODUCT SETUP
5 SETTINGS
5
5.2.6 DEMAND
5.2.6.1 METERING VALUES AND SETTINGS
The demand calculation is made according to the following primary parameters:
Table 5–15: PRIMARY DEMAND VALUES
Different integration methods can be selected to calculate current and power values.
Calculated demand values are as follows:
Table 5–16: DEMAND CALCULATED VALUES
The relay measures current demanded on each phase, ground and sensitive ground, negative sequence and three-phase
demand for real, reactive and apparent power. Current and Power methods can be chosen separately. Settings are
provided to disable certain measuring techniques. These techniques are used by many utilities for statistical or control
purposes.
PRIMARY DEMAND VALUES
STEP
IA (RMS)
KA
IB (RMS)
KA
IC (RMS)
KA
IG (RMS)
KA
ISG (RMS)
KA
I2
KA
Three phase active power (W)
MW
Three phase reactive power (VAR)
MVAr
Apparent power (VA)
MVA
DEMAND CALCULATED VALUES
DEMAND IA
DEMAND IG
DEMAND W
DEMAND IA MAX
DEMAND IG MAX
DEMAND W MAX
DEMAND IA DATE
DEMAND IG DATE
DEMAND W DATE
DEMAND IB
DEMAND ISG
DEMAND VAR PWR
DEMAND IB MAX
DEMAND ISG MAX
DEMAND VAR MAX
DEMAND IB DATE
DEMAND ISG DATE
DEMAND VAR DATE
DEMAND IC
DEMAND I2
DEMAND VA PWR
DEMAND IC MAX
DEMAND I2 MAX
DEMAND VA MAX
DEMAND IC DATE
DEMAND I2 DATE
DEMAND VA DATE
Summary of Contents for Multilin G650
Page 9: ...8 G650 Generator Protection Control System GEK 113285A TABLE OF CONTENTS ...
Page 426: ...GEK 113285A G650 Generator Protection Control System A 31 APPENDIX A A 1 LOGIC OPERANDS A ...
Page 427: ...A 32 G650 Generator Protection Control System GEK 113285A A 1 LOGIC OPERANDS APPENDIXA A ...
Page 587: ...C 22 G650 Generator Protection Control System GEK 113285A C 8 ANALOG INPUTS APPENDIXC C ...
Page 639: ...G 2 G650 Generator Protection Control System GEK 113285A G 1 GE MULTILIN WARRANTY APPENDIXG G ...