Caution:
Refer to
Fastener Caution
in the Preface section.
Install the floor air outlet (2).
1.
Install the 6 floor air outlet bolts (1) and tighten to
2.5 N·m (23 lb in)
.
Install the heater wiring harness.
2.
Install the instrument panel tie bar (2).
3.
• Install the 4 instrument panel tie bar bolts (3, 4) and tighten to
22 N·m (17 lb ft)
.
• Install the 2 instrument panel tie bar nuts (1) and tighten to
9 N·m (80 lb in)
.
Attach the instrument panel wiring harness (2) to the instrument panel tie bar (1).
4.
Connect the electrical connectors.
Install the instrument panel assembly. Refer to
Instrument Panel Assembly Replacement
.
5.
Heating, Ventilation and Air Conditioning
HVAC SYSTEM
S e c tion 10
BACK TO CHAPTER INDEX
CHEVROLET CRUZE BODY REPAIR MANUAL 2010
TO MODEL INDEX