8
Configure the desired settings, then click
OK
.
Two PSUs Are Installed
If you add multiple PSU devices to your TS51210RH series, the following connection setups are available.
A. To Boot the TeraStation After the Power Supply Recovers (Recommended)
Connect both power cables of the TeraStation to a single UPS device.
Wall Socket
UPS
TS51210RH
B. To Increase Redundancy for Power Failure
Connect one power cable of the TeraStation to the UPS device and the other to the wall socket. Use different power
supply systems to increase redundancy.
137
Summary of Contents for TeraStation 5010 TS51210RH
Page 32: ...3 Click Create User 31...
Page 35: ...3 Click Add Group 34...
Page 103: ...2 Click to the right of Failover 3 Click the Periodic Sync tab 4 Click Edit 102...
Page 106: ...15Click Time Machine 105...
Page 107: ...16Click Select Backup Disk 17Select the TeraStation then click Use Disk 106...
Page 122: ...5 Click Edit 121...
Page 145: ...7 Click to the right of NFS 8 Click the Client Settings tab 144...
Page 168: ...3 Click Edit 167...
Page 169: ...4 Select or enter the desired MTU size and click OK 168...
Page 171: ...3 Click Edit 170...
Page 211: ...IEC60950 1 WARNING Hazardous moving parts Keep away from moving fan blades 210...