Policy-Based Data Replication
System Administration Manual
350
To modify a Replication Schedule
Once defined, schedules can be easily modified to meet the changing requirements of the
Replication Policies. When modifying a schedule, the scheduled date and time, as well as the
interval in which the schedule will run can be changed.
1.
From the
Replication
page, select a schedule to modify.
2.
Click
details
.
3.
To start the selected Replication Policy immediately, click
run now
.
4.
If the previous replication attempt failed, click restart to
restart
the replication or, if
available,
rollback
the target file system to the snapshot taken after the last successful
replication.