Data Protection
347
Titan SiliconServer
To view Scheduled Replications
From the
Home
page, click
Data Protection.
Then, click
Replication
.
The fields on this screen are described in the table below:
Item/Field
Description
Id
Displays the ID assigned to the Replication Policy.
Policies
Displays the name given to the Replication Policy.
Next Run
Displays the month, date, year and time for the next
scheduled replication run for this policy.
Interval
Displays the frequency at which the replication has been
scheduled to run.
Last Status
Displays a light indicator for successful and failed replication
jobs. A green light represents a successful replication job has
completed. Failed replication jobs will display a red light and
the reason for failure.
Note: In case of a replication failure, the next time
a replication is started the data management
engine attempts to restart the failed replication
instead of starting a new replication.