2 - 20
SPEC
Î
Pass the radiator breather
hose in front of the radiator, on
the left of the chassis, and then
between the frame and radiator
hose 4.
Ï
Fasten the sub-wire harness
and engine stop switch lead to
the CDI unit bracket at the
white-taped portion of the sub-
wire harness and with the
clamp ends facing downward.
Ð
Locate the clamp ends in the
arrowed range.
Ñ
Fasten the neutral switch lead
and CDI magneto lead over the
hump of the frame.
Ò
Fasten the hot starter cable
and throttle cable onto the
frame. Locate the clamp ends
under the hot starter cable.
5
Ð
Ð
B-B
C-C
E-E
H-H
G-G
D-D
A-A
G
4
5
1
7
H
Ð
B
B
0
9
F
3
Ñ
6
9
0
F
È
9
C
C
C
E
H
H
G
A
A
B
E
7
3
8
3
9
Ê
Ê
Ë
F
E
3
D
C
B
3
A
3
Ì
Í
Î
Ï
1
2
3
4
5
6
3
B
0
9
A
0
É
B
B
0
9
9
D
G
B
D
Ò
3
CABLE ROUTING DIAGRAM