2 - 18
SPEC
CABLE ROUTING DIAGRAM
EC240000
CABLE ROUTING DIAGRAM
1
Fuel tank breather hose
2
Radiator hose 1
3
Cylinder head breather hose
4
Radiator hose 4
5
Clutch cable
6
Throttle position sensor lead
7
Fuel hose
8
Hot starter cable
9
Carburetor breather hose
0
Carburetor overflow hose
A
Connector cover
È
Insert the end of the fuel tank
breather hose into the hole in
the steering stem.
É
Pass the cylinder head
breather hose on the outside of
the radiator hose 1 and on the
inside of the radiator pipe (radi-
ator hose 4).
Ê
Pass the clutch cable through
the cable guides.
Ë
Pass the clutch cable in front of
the radiator mounting boss.
Ì
Pass the fuel hose between the
hot starter cable and throttle
position sensor lead.
Í
Pass the carburetor breather
hoses and overflow hose so
that all there hoses do not con-
tact the rear shock absorber.
Î
Install the connector cover so
that it does not come in
between the radiator hose 1
and radiator.
B
A
9
9
0
Í
B
A
8
3
A
2
Î
7
Ì
Ë
É
1
È
6
5
4
Ê