Drive commissioning (SIMODRIVE)
10.1 SIMODRIVE 611 universal/E, POSMO CD/CA and SI
Manual
Commissioning Manual, 05/2008, 6FC5397–4CP10–4BA0
347
Recommended procedure
Within the framework of SINUMERIK 840Di sl, the procedure described in Point 3 is
recommended:
The advantages of this procedure are:
●
SimoCom U is always available for:
–
Commissioning
–
Diagnostics
–
Controller - Tuning
–
SW upgrading of drive firmware
–
SW upgrading of firmware optional module
●
No additional PG/PC required
●
No additional cables required
10.1.2
Preconditions for an online connection
To be able to establish an online connection between SimoCom U and the SIMODRIVE 611
universal drives connected using PROFIBUS DP, the following preconditions must be
fulfilled:
●
SimoCom U must be installed.
–
For installing SimoCom U, see Chapter "Install SimoCom U" (Page 354)
●
A PROFIBUS connection must exist from the PROFIBUS interface of the MCI board to all
drives.
–
For network rules, see Chapter "Network rules" (Page 234)
●
The PROFIBUS address must be set in all drives.
–
For SIMODRIVE 611 universal/E refer to Chapter "Set PROFIBUS address
(SIMODRIVE 611 universal/E)" (Page 348)
–
For SIMODRIVE POSMO CD/CA and SI, refer to Chapter "Set PROFIBUS address
(SIMODRIVE POSMO SI/CD/CA)" (Page 349)
●
The configuration must be loaded into the PLC.
–
For creating an S7 project, see Chapter "Create SIMATIC S7 project" (Page 160)
–
For loading the PLC, refer to Chapter "Parameterize isochronous DP slaves
●
The access interface of SimoCom U must be set to "SOFTMC".
–
To set the interface, refer to Chapter "Set Access Interface" (Page 350)
●
The routing information for the PLC must be set.
–
For setting the routing Information, see Chapter "Set routing information" (Page 351)
Содержание SINUMERIK 840Di sl
Страница 118: ...Configuration 3 3 Connection overview Manual 118 Commissioning Manual 05 2008 6FC5397 4CP10 4BA0 ...
Страница 148: ...Power On and Power Up 5 7 License management Manual 148 Commissioning Manual 05 2008 6FC5397 4CP10 4BA0 ...
Страница 186: ...PLC commissioning 6 8 Load configuration in PG PLC STEP 7 Manual 186 Commissioning Manual 05 2008 6FC5397 4CP10 4BA0 ...
Страница 344: ...Drive commissioning SINAMICS 9 5 Basic principles Manual 344 Commissioning Manual 05 2008 6FC5397 4CP10 4BA0 ...
Страница 624: ...Glossary Manual 624 Commissioning Manual 05 2008 6FC5397 4CP10 4BA0 ...