PLC commissioning
6.2 Commissioning
Manual
Commissioning Manual, 05/2008, 6FC5397–4CP10–4BA0
157
6.2.4
Check PLC status and communication interface
The PLC status and therefore also the communications link to the PLC can be checked from
"HW Config" via menu item Target system > Operating status.
●
If the current operating status of the PLC is displayed, the communications link is
operating correctly.
●
If the current operating status of the PLC is not displayed, the communications link must
be checked for correct parameterization. If no connection is established to the PLC
despite correct parameterization, a general reset of the PLC is necessary.
PLC general reset
A general reset of the PLC can be performed using 840Di Startup or HMI Advanced (option):
●
840Di startup
–
Start 840Di startup: Windows XP taskbar: Start > Programs > SINUMERIK 840Di >
840Di-Startup.
–
Open the dialog box: Menu command Window > Diagnosis > NC/PLC.
●
HMI Advanced (option).
–
Open the dialog box: Operating area switchover > Start up > NC/PLC Diagnosis
●
Request general reset of PLC: "PLC Delete Program".
After general reset the PLC is in RUN mode, i.e. the LED "RUN" in the display is green:
6.2.5
First commissioning
On first commissioning of the PLC, a general reset of the PLC has to be performed after the
SINUMERIK 840Di sl has been switched on and booted.
To obtain a defined initial state of the whole system (NC and PLC), the NC data should also
be deleted.
●
PLC general reset
General reset puts the PLC in a defined initial state by deleting and initializing all system
and user data.
●
Delete NC data
After a request to delete NC data, all user data are deleted and the system data are
reinitialized on the next NC power-up, e.g. after NC Reset.
Содержание SINUMERIK 840Di sl
Страница 118: ...Configuration 3 3 Connection overview Manual 118 Commissioning Manual 05 2008 6FC5397 4CP10 4BA0 ...
Страница 148: ...Power On and Power Up 5 7 License management Manual 148 Commissioning Manual 05 2008 6FC5397 4CP10 4BA0 ...
Страница 186: ...PLC commissioning 6 8 Load configuration in PG PLC STEP 7 Manual 186 Commissioning Manual 05 2008 6FC5397 4CP10 4BA0 ...
Страница 344: ...Drive commissioning SINAMICS 9 5 Basic principles Manual 344 Commissioning Manual 05 2008 6FC5397 4CP10 4BA0 ...
Страница 624: ...Glossary Manual 624 Commissioning Manual 05 2008 6FC5397 4CP10 4BA0 ...