PLC commissioning
6.3 Creating a SIMATIC S7 project
Manual
Commissioning Manual, 05/2008, 6FC5397–4CP10–4BA0
161
6.3.1
Create a project
To create a new project select menu command File > New in the SIMATIC Manager.
Enter the following project data in the dialog and confirm with OK:
●
Name (for example: SIN840Di sl)
●
Storage location (path)
●
Type
The project window is now displayed showing an empty S7 project structure.
6.3.2
Inserting Station 300
Before you can insert the required hardware in the S7 project you must first insert a
SIMATIC Station 300 in the project. Select the menu command Insert > Station > SIMATIC
Station-300.
6,1
6,0$7,&0DQDJHU6,1'LVO
6,1'LVOLQVWDOODWLRQSDWK!?VWHS?VSURM?6,1'LVO
6WDWLRQ(GLW,QVHUW7DUJHW6\VWHP9LHZ7RROV:LQGRZ+HOS
QR)LOWHU!
&XW
&WUO;
&RS\
3DVWH
'HOHWH
,QVHWQHZREMHFW
3/&
5HQDPH)
2EMHFW3URSHUWLHV$OW5HWXUQ
6,0$7,&6WDWLRQ
6,0$7,&6WDWLRQ
6,0$7,&+6WDWLRQ
6,0$7,&3&6WDWLRQ
2WKHU6WDWLRQV
6,0$7,&6
3*3&
03,
352),%86
,QGXVWULDO(WKHUQHW
373
3URMHFW:LQGRZ
Figure 6-2
Inserting the SIMATIC 300 station
Содержание SINUMERIK 840Di sl
Страница 118: ...Configuration 3 3 Connection overview Manual 118 Commissioning Manual 05 2008 6FC5397 4CP10 4BA0 ...
Страница 148: ...Power On and Power Up 5 7 License management Manual 148 Commissioning Manual 05 2008 6FC5397 4CP10 4BA0 ...
Страница 186: ...PLC commissioning 6 8 Load configuration in PG PLC STEP 7 Manual 186 Commissioning Manual 05 2008 6FC5397 4CP10 4BA0 ...
Страница 344: ...Drive commissioning SINAMICS 9 5 Basic principles Manual 344 Commissioning Manual 05 2008 6FC5397 4CP10 4BA0 ...
Страница 624: ...Glossary Manual 624 Commissioning Manual 05 2008 6FC5397 4CP10 4BA0 ...