PLC commissioning
6.1 General
Manual
150
Commissioning Manual, 05/2008, 6FC5397–4CP10–4BA0
PLC317-2DP (6FC5 317-2AJ10-0AB0)
Process image
256/256 bytes
Inputs/outputs (addressing)
Row 0 is integrated in the NC. Rows 1 to 3 are available for I/O
devices
Through optional configuring
of I/O devices
Digital
From I/O byte 0
Analog
From PI/PO byte 272 only
PROFIBUS
Processing time
Bit instructions (I/O)
<= 0.031 ms/kA
Word instructions
0.1 ms/kA
PDIAG (Alarm S,SQ)
Yes
PROFIBUS
Master/Slave
Number of PROFIBUS slaves (see note below)
max. 125
PBC programmable block communication
Yes
Consistent data to standard slave via SFC 14, 15
128
6.1.3
PLC program
The PLC program is constructed modularly. It comprises the two parts:
●
PLC basic program
The PLC basic program organizes the exchange of signals and data between the PLC
user program and the NCK, HMI, and machine control panel components.
The PLC basic program is part of the PLC Toolbox supplied with SINUMERIK 840Di sl.
●
PLC user program
The PLC user program is the user-specific part of the PLC program by which the basic
PLC program has been added to or extended.
For a complete description of the basic PLC program, its structure and all modules including
their call parameters, please refer to:
References:
/FB1/ Function Manual, Basic Functions; Subsection "PLC Basic Program" P3
Содержание SINUMERIK 840Di sl
Страница 118: ...Configuration 3 3 Connection overview Manual 118 Commissioning Manual 05 2008 6FC5397 4CP10 4BA0 ...
Страница 148: ...Power On and Power Up 5 7 License management Manual 148 Commissioning Manual 05 2008 6FC5397 4CP10 4BA0 ...
Страница 186: ...PLC commissioning 6 8 Load configuration in PG PLC STEP 7 Manual 186 Commissioning Manual 05 2008 6FC5397 4CP10 4BA0 ...
Страница 344: ...Drive commissioning SINAMICS 9 5 Basic principles Manual 344 Commissioning Manual 05 2008 6FC5397 4CP10 4BA0 ...
Страница 624: ...Glossary Manual 624 Commissioning Manual 05 2008 6FC5397 4CP10 4BA0 ...