|
Note: If the new chassis has a blower without a wired connector
and the
|
blower from the old chassis has a blower with a wired connector, install
|
the blower with the wired connector, in the new chassis using the
|
instructions in “Exchanging a Blower in Models 4xx” on page 2-6.
7. Attach the hard drive to the base of the chassis with its four screws.
8. Reinstall the cover of the IBM 2212 using the instructions in “Reinstalling the
Cover” on page 2-5.
9. Install the system card and adapters.
10. Attach an ASCII terminal to the IBM 2212 as described in Chapter 3,
“Accessing the IBM 2212” on page 3-1.
11. Power on the IBM 2212 by plugging in the power cord.
12. Access the
SVC>
prompt. (See “Accessing the Service Recovery Prompt
(SVC>)” on page E-4.)
13. Enter into Vital Product Data (VPD) the serial number of the defective IBM
2212 chassis. The serial number is printed on the back of the IBM 2212. For
instructions on entering the serial number into the VPD, see “Entering Vital
Product Data” on page E-14.
14. Type reboot.
15. Verify the LEDs. See “LED Indicators” on page 1-2.
16. Reference the serial number recorded from the old chassis and write this serial
number on a label. Also write the chassis model number on the label. Post this
label on the exterior of the new chassis.
17. Notify the network administrator that you are finished.
Chapter 2. Removal and Replacement Procedures
2-35
Содержание Cloud Object Storage System Slicestor 2212...
Страница 1: ...2212 Access Utility Service and Maintenance Manual GY27 0362 02...
Страница 8: ...viii 2212 Service and Maintenance...
Страница 28: ...1 20 2212 Service and Maintenance...
Страница 86: ...3 8 2212 Service and Maintenance...
Страница 98: ...5 4 2212 Service and Maintenance...
Страница 110: ...Testing the Adapters 6 12 2212 Service and Maintenance...
Страница 112: ...Assembly 1 Final Assembly IBM 2212 Models 10x A 2 2212 Service and Maintenance...
Страница 114: ...Assembly 2 Final Assembly IBM 2212 Models 15x A 4 2212 Service and Maintenance...
Страница 116: ...Assembly 3 Final Assembly IBM 2212 Models 1xx A 6 2212 Service and Maintenance...
Страница 118: ...Assembly 4 Final Assembly IBM 2212 Models 1xx A 8 2212 Service and Maintenance...
Страница 120: ...Assembly 5 Final Assembly IBM 2212 Models 40x A 10 2212 Service and Maintenance...
Страница 122: ...Assembly 6 Final Assembly IBM 2212 Models 45x A 12 2212 Service and Maintenance...
Страница 124: ...Assembly 7 Final Assembly IBM 2212 Models 4xx A 14 2212 Service and Maintenance...
Страница 126: ...Assembly 8 Final Assembly IBM 2212 Models 4xx A 16 2212 Service and Maintenance...
Страница 130: ...A 20 2212 Service and Maintenance...
Страница 136: ...1 2 3 4 5 6 7 8 9 10 Figure C 1 AC Power Cord Plugs by Country C 4 2212 Service and Maintenance...
Страница 138: ...D 2 2212 Service and Maintenance...
Страница 166: ...E 28 2212 Service and Maintenance...
Страница 195: ......
Страница 197: ...Spine information 2212 Access Utility Service and Maintenance Manual...