Accessing OPCON from SVC>
Question How do I access the OPCON command line interface from within the service recovery function
(
SVC>
)?
Answer
From the
SVC>
prompt, type Bootmode, then select 3. Normal Boot From Disk and press
Enter. Next, type reboot and press Enter. The OPCON prompt
*
is displayed after the system
boots.
Navigating Through the OPCON Command Line Interface
Question How do I use the commands in the Command Line Interface?
Answer
The structure of the interface is shown in Figure E-1.
The
Access Integration Services Software User’s Guide describes the entire command line
interface. The basic prompts that you use are the:
¹
*
prompt, which is the OPerating CONsole (OPCON) prompt, the initial entry point to the
command line interface
¹
Config
>
prompt, which is used for configuration changes
¹
+
prompt, which is known as monitoring or GWCON.
¹
Config Only
>
prompt, which is used for initial configuration. The IBM 2212 boots to this
prompt if it has not been configured. You cannot access GWCON (
+
) from the
Config
Only>
prompt.
The basic commands are:
¹
Type ? and press Enter at any time to view a list of possible commands.
¹
Type exit and press Enter to return to the
+
prompt and to the
Config
>
prompt.
¹
Press the Ctrl-p keys to return to the
*
prompt.
┌─────┐
First
┌───────────────────5│OPCON│%───────────────────┐
Level
│
│ * │
│
│
└┬───┬┘
│
│
┌──────────┘ & └─────────┐
│
│
Talk 5
│
Talk 6
│
│
│
│
│
│
│
│
│
│
│
│
│
│
│
│
│
6
│
6
│
│
┌───────┐
│
┌───────┐
│
Second
│
│GWCON
│
ctrl-p
│CONFIG │
│
Level
│
│process├───────┴───────┤process│
│
│
└──┬────┘
└────┬──┘
│
│
│
&
&
│
│
│
Prot 0
│
│
Prot 0
│
│
│
│
│
│
│
│
│
│
│
│
│
│
│
│
│
│
│
│
│
│
│
│
│
ctrl-p
6
│
│
6
ctrl-p
Third
│
┌─────┐│
│┌──────────┐
│
Level
└───────┤IP>
│Exit
Exit│IP Config>├──┘
└─────┘
└──────────┘
Figure
E-1. Structure of the Command Line Interface with the protocol command (Prot) as an example
Appendix E. Common Tasks
E-3
Содержание Cloud Object Storage System Slicestor 2212...
Страница 1: ...2212 Access Utility Service and Maintenance Manual GY27 0362 02...
Страница 8: ...viii 2212 Service and Maintenance...
Страница 28: ...1 20 2212 Service and Maintenance...
Страница 86: ...3 8 2212 Service and Maintenance...
Страница 98: ...5 4 2212 Service and Maintenance...
Страница 110: ...Testing the Adapters 6 12 2212 Service and Maintenance...
Страница 112: ...Assembly 1 Final Assembly IBM 2212 Models 10x A 2 2212 Service and Maintenance...
Страница 114: ...Assembly 2 Final Assembly IBM 2212 Models 15x A 4 2212 Service and Maintenance...
Страница 116: ...Assembly 3 Final Assembly IBM 2212 Models 1xx A 6 2212 Service and Maintenance...
Страница 118: ...Assembly 4 Final Assembly IBM 2212 Models 1xx A 8 2212 Service and Maintenance...
Страница 120: ...Assembly 5 Final Assembly IBM 2212 Models 40x A 10 2212 Service and Maintenance...
Страница 122: ...Assembly 6 Final Assembly IBM 2212 Models 45x A 12 2212 Service and Maintenance...
Страница 124: ...Assembly 7 Final Assembly IBM 2212 Models 4xx A 14 2212 Service and Maintenance...
Страница 126: ...Assembly 8 Final Assembly IBM 2212 Models 4xx A 16 2212 Service and Maintenance...
Страница 130: ...A 20 2212 Service and Maintenance...
Страница 136: ...1 2 3 4 5 6 7 8 9 10 Figure C 1 AC Power Cord Plugs by Country C 4 2212 Service and Maintenance...
Страница 138: ...D 2 2212 Service and Maintenance...
Страница 166: ...E 28 2212 Service and Maintenance...
Страница 195: ......
Страница 197: ...Spine information 2212 Access Utility Service and Maintenance Manual...