The Fe-lithium battery is connected to the input port of the power system through a power cable
and connected to the MA5616 through an RS485 serial port cable. When detecting a Fe-lithium
battery, the MA5616 issues a command to the power system to adjust the voltage. The charging
mode of a Fe-lithium battery is the equalizing mode.
When the mains supply fails, the Fe-lithium battery provides power for the MA5616 to ensure
the normal running of the device in a certain period. When the mains supply recovers, the Fe-
lithium battery stops discharging and starts charging.
Procedure
Step 1
Add the EPS30-4815AF, namely, Power4830.
Run the
emu add
command to add the Power4830.
Step 2
Configure the parameter of the rectifier unit.
Run the
power module-num
command to configure the parameter of the rectifier unit.
Step 3
Configure the environment parameters for power supply monitoring.
Run the
power environment
command to configure the upper and lower alarm thresholds and
measurement thresholds of temperature or humidity for power monitoring. In this manner, the
power module generates alarms when it works in a condition that does not meet the present
requirements.
Step 4
Configure the external extended digital parameter for power supply monitoring.
Run the
power outside_digital
command to configure the external extended digital parameter
for power supply monitoring.
Step 5
Query configuration parameters and environment parameters of the power system.
Run the
display power system parameter
command to query configuration parameters of the
power monitoring unit.
Step 6
Run the
display power alarm
command to query the alarm. Ensure that no alarm (except the
door status alarm) for the monitoring parameter is generated.
Step 7
Save the data.
Run the
quit
command to quit the Power4830 mode, and then run the
save
command to save
the data.
Step 8
Configure the Fe-lithium battery monitoring unit.
1.
Run the
emu add
command to add a Fe-lithium battery monitoring unit.
2.
(Optional) Run the
power batteryinstall
command to set the time for installing the battery.
3.
Run the
display power run info
command to query the battery running information, such
as the charging status and remaining power.
4.
(Optional) Run the
display power batteryinstalltime
command to query the time for
installing the battery.
5.
Run the
save
command to save the data.
NOTE
The subnode ID of the Fe-lithium battery is invariably 23.
----End
SmartAX MA5616 Multi-service Access Module
Configuration Guide
3 Basic Configuration
Issue 04 (2011-10-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
148