iManager NetEco 6000
Device Installation and Commissioning Guide
3 Installing Devices
Issue 03 (2019-03-10)
Copyright © Huawei Technologies Co., Ltd.
49
Two hex socket screws need to be removed in this step.
Figure 3-51
Removing the hoisting strip
Step 4
Secure the hosting strip using the delivered screws, as shown by (1) in
Pay attention to the direction of the hoisting strip, and ensure that the bulging surface of the
magnetic lock faces the magnet.