iManager NetEco 6000
Device Installation and Commissioning Guide
6 Adding Devices
Issue 03 (2019-03-10)
Copyright © Huawei Technologies Co., Ltd.
243
Path
Parameter
Default
Value
Setting Value
System
Settings
>
NMS
Application
>
NetEco
>
Communicati
on
Parameters
Server IP
192.168.0.1
1
IP address of the primary NetEco server
NOTE
The NetEco IP address and the ECC800 IP
address must be configured in the same
network to ensure normal connection
between the NetEco and the ECC800.
Port number
31220
31220
Link to the
monitoring IP
address
WAN_1
WAN_1
Step 4
Set site configuration parameters on the ECC800 WebUI.
Table 6-47
Site Configuration parameters
Path
Parameter
Default
Value
Setting Value
System
Settings
>
System
Parameters
>
Site
Configuration
Smart module
name
FusionMod
ule
Sets the user-defined smart module
name.
System Type
FusionMod
ule2000
Set the required system type.
----End
6.5.2.2 Creating an ECC800 Collector on the NetEco
Prerequisites
You have logged in to the NetEco client by web browser
You have created a modular or container in
Data Center Planning
. For detailed
operations, see Creating a Domain.
The IP address of the NetEco connected has been configured on the ECC800 WebUI.
Procedure
Step 1
Choose
Configuration
>
Configuration Management
>
Data Center Planning
from the
main menu. The
Data Center Planning
window is displayed.
Step 2
Click in the upper left area of the
Data Center Planning
page to switch to the
Uncreated
Device Information
page.