iManager NetEco 6000
Device Installation and Commissioning Guide
4 Connecting Monitoring Cables to Devices
Issue 03 (2019-03-10)
Copyright © Huawei Technologies Co., Ltd.
74
Figure 4-19
Positions of the NetCol8000-C070 and NetCol8000-C150 main control modules
(1) Main control module
Figure 4-20
Main Control Module
(1) FE_1 port
Step 2
Connect the other end of the network cable to the Ethernet port on the LAN switch.
----End