Demand module settings are as follows:
Table 5–17: DEMAND SETTINGS
Function permission (Function):
This setting enables the demand function.
Demand Method for Current values (CRNT Demand Method):
Selection of the demand calculation method for current
values. Available methods are Thermal Exponential, Block interval, and Rolling
Demand.
Demand Method for Power values (POWER Demand Method):
Selection of the demand calculation method for power
values. Available methods are Thermal Exponential, Block interval, and Rolling
Demand.
Demand Interval:
Integration interval. Available intervals are 5, 10, 15, 20, 30, 60 minutes.
Measurement integration is performed in the period adjusted in the Demand Interval
setting.
Demand Trigger:
Operation mode selection for the Block Interval calculation method. This operation
mode depends on the “Trigger Enabled” setting. If trigger enabled is set as disabled,
measurement integration is made in the Demand Interval period. If trigger enabled is
enabled, measurement integration is made during the time interval between two
consecutive pulses of the input assigned as DEMAND TRIGGER INP,. This input is
set at
Setpoint > Relay configuration > Protection Elements
Snapshot Events:
This setting enables or disables the snapshot event generation for the demand
element.
5.2.6.2 DEMAND CALCULATION METHODS
a) CALCULATION METHOD 1: THERMAL EXPONENTIAL
This method simulates the action of an analog peak recording thermal demand meter. The relay measures the magnitude
for each phase (or three-phase, depending on the case) every second, and it assumes that the magnitude remains the
same until the next update. It calculates the equivalent thermal demand using the following equation:
Where:
D
Input signal (constant).
d(t)
Demand value after applying the input value during time t (in minutes)
K
2.3 / thermal 90% response time
SETPOINT > PRODUCT SETUP > DEMAND
Setting Description
Name
Default Value
Step
Range
Function permission
Demand Function
DISABLED
N/A
[DISABLED – ENABLED]
Demand method for current values CRNT Demand Method
THERMAL EXPONENTIAL
N/A
[BLOCK INTERVAL -
ROLLING DEMAND -
THERMAL EXPONENTIAL]
Demand method for Power values POWER Demand Method
THERMAL EXPONENTIAL
N/A
[BLOCK INTERVAL -
ROLLING DEMAND -
THERMAL EXPONENTIAL]
Demand interval
Demand Interval
5 Minutes
N/A
[5 – 10 – 15 – 20– 30–60]
Trigger Enabled
Trigger Enabled
DISABLED
N/A
[DISABLED – ENABLED]
Snapshot Event generation
Snapshot Events
ENABLED
N/A
[DISABLED – ENABLED]
)
1
(
)
(
Kt
e
D
t
d
−
−
=
Содержание Multilin G650
Страница 9: ...8 G650 Generator Protection Control System GEK 113285A TABLE OF CONTENTS ...
Страница 29: ...1 20 G650 Generator Protection Control System GEK 113285A 1 4 650 HARDWARE 1 GETTING STARTED 1 ...
Страница 293: ...5 150 G650 Generator Protection Control System GEK 113285A 5 9 LOGIC CONFIGURATION PLC EDITOR 5 SETTINGS 5 ...
Страница 391: ...11 6 G650 Generator Protection Control System GEK 113285A 11 4 RELAY CONFIGURATION 11 FREQUENTLY ASKED QUESTIONS 11 ...
Страница 426: ...GEK 113285A G650 Generator Protection Control System A 31 APPENDIX A A 1 LOGIC OPERANDS A ...
Страница 427: ...A 32 G650 Generator Protection Control System GEK 113285A A 1 LOGIC OPERANDS APPENDIXA A ...
Страница 587: ...C 22 G650 Generator Protection Control System GEK 113285A C 8 ANALOG INPUTS APPENDIXC C ...
Страница 595: ...D 8 G650 Generator Protection Control System GEK 113285A D 5 IEC 60870 5 104 POINT LIST APPENDIXD D ...
Страница 606: ...GEK 113285A G650 Generator Protection Control System E 11 APPENDIX E E 1 FACTORY DEFAULT LOGIC E ...
Страница 607: ...E 12 G650 Generator Protection Control System GEK 113285A E 1 FACTORY DEFAULT LOGIC APPENDIXE E ...
Страница 639: ...G 2 G650 Generator Protection Control System GEK 113285A G 1 GE MULTILIN WARRANTY APPENDIXG G ...