Proline Promag H 500 PROFIBUS DP
Commissioning
Hauser
105
10
Commissioning
10.1 Function check
Before commissioning the measuring device:
‣
Make sure that the post-installation and post-connection checks have been performed.
• "Post-installation check" checklist→ 34
• "Post-connection check" checklist → 63
10.2 Switching on the measuring device
‣
After a successful function check, switch on the measuring device.
After a successful startup, the local display switches automatically from the startup
display to the operational display.
If nothing appears on the local display or a diagnostic message is displayed, refer to
the section on "Diagnostics and troubleshooting" → 158.
10.3 Connecting via FieldCare
• For FieldCare → 85 connection
• For connecting via FieldCare → 88
• For the FieldCare → 89 user interface
10.4 Configuring the device address via software
In the
"Communication" submenu
the device address can be set.
Navigation
"Setup" menu → Communication → Device address
10.4.1 PROFIBUS network
At time of delivery, the measuring device has the following factory setting:
Device address
126
• To display the current device address:
Device address
• If hardware addressing is active, software addressing is blocked → 58
10.5 Setting the operating language
Factory setting: English or ordered local language
Содержание Proline Promag H 500
Страница 240: ...www addresses endress com...