7.6.3.2.1 Handover UP Swap sequence
As explain above, the automatic priority swapping evaluates the load of the system and assigns the
most appropriate power band. The handover UP sequence describes the situation the gen-set with
lower nominal power is swapped by the gen-set with higher nominal power. The gen-set with lower
nominal capacity is stopped once the sequence is over. The stopped gen-set is in ready state and
keeps available in power management.
Powe
r
[kW]
Sum of available nominal
power
– running gen-sets
in PM
Load
Level of Load reserve start
Setpoint #LoadResStrt X
Nom G1
Time
Nom
G1+G2
Gen 2
Ready
#NextStrt del
Start
Stabilization
Synchronization
Soft loading
Loaded
Running
Gen 1
BO Syst res OK
Loaded
Soft unloading
GCB opened
#NextStop Del
Stopped and ready to PM
Nom G2
#PwrBnChngDlUp
#NextStop Del*
Sum of available nominal power
– running gen-sets in PM*
Cooling
Time
*Soft unloading
GCB opened
*Cooling
N
OTE
:
If the power band change delay
Pwr management:
#PwrBnChngDlUp
is adjusted to that longer value
than total time requiring start of other gen-set, stabilization, synchronization, GCB closing and soft
loading, it postpones the soft unloading of the gen-set to be stopped. This delay is depicted by the
dashed orange line. Consequently, the handover up swap sequence is postponed by this delay.
Содержание InteliMains NT IM-NT
Страница 150: ...InteliMains NT SW version 3 2 0 InteliMains NT MCB MGCB 3 2 0 Reference Guide pdf ComAp April 2015 150 APPENDIX...
Страница 435: ...InteliMains NT SW version 3 2 0 InteliMains NT MCB MGCB 3 2 0 Reference Guide pdf ComAp April 2015 435 16 User Notes...
Страница 436: ...InteliMains NT SW version 3 2 0 InteliMains NT MCB MGCB 3 2 0 Reference Guide pdf ComAp April 2015 436...
Страница 437: ...InteliMains NT SW version 3 2 0 InteliMains NT MCB MGCB 3 2 0 Reference Guide pdf ComAp April 2015 437...