3.7
Voltage and current inputs (general)
W
ARNING
!
Risk of personal injury due to electric shock when manipulating voltage terminals under voltage! Be
sure the terminals are not under voltage before touching them.
W
ARNING
!
Do not open the secondary circuit of current transformers when the primary circuit is closed!!! Open
the primary circuit first!
Use
1.5 mm
2
cables for voltage connection and
2.5 mm
2
for current transformers connection.
Adjust nominal voltage, nominal current, CT ratio and PT ratio by appropriate setpoints in the Basic
Settings group.
V
OLTAGE MEASUREMENT WIRING
A) B)
L1
L2
L3
N
N
L3
L2
L1
MAINS
N
L3
L2
L1
BUS
L1
L2
L3
N
L3
L2
L1
MAINS
N
L3
L2
L1
BUS
C
URRENT MEASUREMENT WIRING
A) B)
K
L
k
l
K
L
k
l
K
L
k
l
I
1k
I
1l
I
2k
I
2l
I
3k
I
3l
K
L
k
l
K
L
k
l
I
1k
I
1l
I
2k
I
2l
I
3k
I
3l
C
AUTION
!
Check measurement connections carefully! Failure is possible if phases are connected in wrong order
(WrongPhSequence detected by the controller) but this is not detected if the phases are just rotated
(i.e. instead of phase sequence L1, L2, L3, phase sequence is e.g. L2, L3, L1.
Содержание InteliMains NT IM-NT
Страница 150: ...InteliMains NT SW version 3 2 0 InteliMains NT MCB MGCB 3 2 0 Reference Guide pdf ComAp April 2015 150 APPENDIX...
Страница 435: ...InteliMains NT SW version 3 2 0 InteliMains NT MCB MGCB 3 2 0 Reference Guide pdf ComAp April 2015 435 16 User Notes...
Страница 436: ...InteliMains NT SW version 3 2 0 InteliMains NT MCB MGCB 3 2 0 Reference Guide pdf ComAp April 2015 436...
Страница 437: ...InteliMains NT SW version 3 2 0 InteliMains NT MCB MGCB 3 2 0 Reference Guide pdf ComAp April 2015 437...