InteliMains
NT
, SW version 3.2.0
InteliMains-NT-MCB-MGCB-3.2.0-Reference Guide.pdf,
©ComAp – April 2015
79
7.6.2.3
Priorities
The priority of the gen-set within the group is given by the setpoint
Pwr management:
Priority
. Lower
number represents "higher" priority, i.e. a gen-set with lower number starts before another one with
higher number. In other words, the setpoint
Pwr management:
Priority
means order in which gen-sets
are started and connected to the bus. An example is shown on the figure below. There are four gen-
sets with following choice of setpoints:
Setpoint
group
Basic
settings
Pwr management
Setpoint
Nomin
power
Pwr
management
#Pwr mgmt
mode
Priority
#PriorityAutoS
wap
#LoadResStr
t X
#LoadResStop
X
Gen-set #1
200 kW
ENABLED
ABS (kW)
4
DISABLED
50 kW
70 kW
Gen-set #2
200 kW
ENABLED
ABS (kW)
3
DISABLED
50 kW
70 kW
Gen-set #3
200 kW
ENABLED
ABS (kW)
2
DISABLED
50 kW
70 kW
Gen-set #4
200 kW
ENABLED
ABS (kW)
1
DISABLED
50 kW
70 kW
Powe
r
[% /
kW]
Sum of available nominal
power
– running gen-sets
in PM
Total load of the system
Level to start additional gen-
set Nom Pwr - #LoadResStrt X
Level to stop additional gen-set
Nom Pwr - #LoadResStop X
130
330
150
350
400
Time
Time
Starting
sequence
Gen #4 Priority = 1
Gen #3 Priority = 2
Gen #2 Priority = 3
Starting sequence
Stopping sequence
200
330
350
400
800
Gen #1 Priority = 4
Starting
sequence
Starting
sequence
Stopping
sequence
Stopping
sequence
Stopping
sequence
Figure:
Power management example - Priorities
Содержание InteliMains NT IM-NT
Страница 150: ...InteliMains NT SW version 3 2 0 InteliMains NT MCB MGCB 3 2 0 Reference Guide pdf ComAp April 2015 150 APPENDIX...
Страница 435: ...InteliMains NT SW version 3 2 0 InteliMains NT MCB MGCB 3 2 0 Reference Guide pdf ComAp April 2015 435 16 User Notes...
Страница 436: ...InteliMains NT SW version 3 2 0 InteliMains NT MCB MGCB 3 2 0 Reference Guide pdf ComAp April 2015 436...
Страница 437: ...InteliMains NT SW version 3 2 0 InteliMains NT MCB MGCB 3 2 0 Reference Guide pdf ComAp April 2015 437...