InteliMains
NT
, SW version 3.2.0
InteliMains-NT-MCB-MGCB-3.2.0-Reference Guide.pdf,
©ComAp – April 2015
250
11.2.10.4
Setpoint: Dwell time
Group
Sync/Load Ctrl
Range [units]
0.0 .. 25.0 [s]
Related FW
standard v3.1.0
Force value
possible
YES
Description
This setpoint adjusts the period of time that the phase angle difference must
stay /-
before the respective breaker, which is actually beeing synchronized, is
closed.
11.2.10.5
Setpoint: Freq gain
Group
Sync/Load Ctrl
Range [units]
0.0 .. 200.0 [%]
Related FW
standard v3.1.0
Description
This setpoint adjusts the gain factor (P-factor) of the frequency control PI
loop. The integration factor (I-factor) for the frequency loop is adjusted by the
setpoint
A
PPLICATION
F
REQ GAIN AND
F
REQ INT SETPOINTS ARE ACTIVE DURING
:
MCB
reverse synchronization of the gen-set group back to the
mains
Содержание InteliMains NT IM-NT
Страница 150: ...InteliMains NT SW version 3 2 0 InteliMains NT MCB MGCB 3 2 0 Reference Guide pdf ComAp April 2015 150 APPENDIX...
Страница 435: ...InteliMains NT SW version 3 2 0 InteliMains NT MCB MGCB 3 2 0 Reference Guide pdf ComAp April 2015 435 16 User Notes...
Страница 436: ...InteliMains NT SW version 3 2 0 InteliMains NT MCB MGCB 3 2 0 Reference Guide pdf ComAp April 2015 436...
Страница 437: ...InteliMains NT SW version 3 2 0 InteliMains NT MCB MGCB 3 2 0 Reference Guide pdf ComAp April 2015 437...