InteliMains
NT
, SW version 3.2.0
InteliMains-NT-MCB-MGCB-3.2.0-Reference Guide.pdf,
©ComAp – April 2015
78
As it is shown on both figures above, the addional gen-set is added once the actual load reserve is
below the level given by the setpoint
Pwr management:
#%LdResStrt X.
The addional gen-set is
removed once the actual load reserve is above the level set by
Pwr management:
#%LdResStop X
.
The green dashed line depicts the value of load at which the additional gen-set is requested to start.
This value of the load value is linked with the setpoint
Pwr management:
#%LdResStrt X
in following
way:
(100 % - #%LdResStrt X) * Sum of Nominal power =
Value of load when additional gen-set requested
to start in kW (in % of nominal power)
E.g.:
(100 %
– 35 %) * 700 kW =
455 kW (65 % of nominal power)
The red dashed line depicts the value of load at which the additional gen-set is requested to stop. This
value of the load value is linked with the setpoint
Pwr management:
#LoadRes Stop X
in following
way:
(100 % - #%LdResStop X) * Sum of Nominal power =
Value of load when additional gen-set requested
to stop in kW (in % of nominal power)
E.g.:
(100 %
– 40 %) * 700 kW =
420 kW (60 % of nominal power)
There are 4 levels for starting and stoping gen-sets.
#%LdResStrt 1
/
#%LdResStop 1
considered
by default
.
#%LdResStrt 2
/
#%LdResStop 2
considered if LBI:
Load res 2 activated
#%LdResStrt 3
/
#%LdResStop 3
considered if LBI:
Load res 3 activated
#%LdResStrt 4
/
#%LdResStop 4
considered if LBI:
Load res 4 activated
N
OTE
:
All controllers cooperating together in Power management must have the same load reserve set
selected.
It is possible to use virtual shared peripheries for distribution of the binary signal to activate LBI
Load
res 2,3
or
4
among controllers over the CAN bus.
SHBIN
BI n
SHBIN
SHBOUT
Power
management
Power
management
Power
management
BO n
BI n
Controller 1
Controller 2
Controller 3
Switch for
activation of load
reserve set #2
BI n
CAN 2
LBI: LoadRes 2
LBI: LoadRes 2
LBI: LoadRes 2
Figure:
Example of using virtual shared peripheries for signal distribution
Содержание InteliMains NT IM-NT
Страница 150: ...InteliMains NT SW version 3 2 0 InteliMains NT MCB MGCB 3 2 0 Reference Guide pdf ComAp April 2015 150 APPENDIX...
Страница 435: ...InteliMains NT SW version 3 2 0 InteliMains NT MCB MGCB 3 2 0 Reference Guide pdf ComAp April 2015 435 16 User Notes...
Страница 436: ...InteliMains NT SW version 3 2 0 InteliMains NT MCB MGCB 3 2 0 Reference Guide pdf ComAp April 2015 436...
Страница 437: ...InteliMains NT SW version 3 2 0 InteliMains NT MCB MGCB 3 2 0 Reference Guide pdf ComAp April 2015 437...